skip to main
|
skip to sidebar
PABRIK SEPATU
Kamis, 31 Oktober 2013
Total Mesin Stamping
Total Machine
Total Machine Installed = 15 units
Total Machine Running = 9 units
Ganti Mold Mesin Stamping
Ganti Mold
Cycle Time : 55 seconds
Mesin Stamping
Stamping Process
Cycle Time in 12 prs : 1'25" = 85 seconds / 12 prs = 7.1 sec/prs
With allowance 15% = 8.1 sec/prs
Capacity/hour = 3600/8.1 = 444 prs/hour
Postingan Lebih Baru
Postingan Lama
Beranda
Langganan:
Postingan (Atom)
Please fill out all the required fields!
Email
*
Name
*
Security Code
*
Please fill out all the required fields!
Submit
Pengikut
Arsip Blog
▼
2013
(3)
▼
Oktober
(3)
Total Mesin Stamping
Ganti Mold Mesin Stamping
Mesin Stamping
►
2009
(1)
►
Januari
(1)
Mengenai Saya
asakti
Lihat profil lengkapku
Buku Tamu
View shoutbox
ShoutMix chat widget